Performing a difficult high-level glazing removal for a leading UK utility supplier.One of the country’s leading Utility Suppliers and an award-winning Facilities Management Company contracted Glazing Refurbishment to undertake a very difficult high-level glazing removal/replacement operation at their prestigious HQ Building located in the heart of the West Midlands.
GR were tasked to remove and refurbish this extensive high level internal glass feature wall.GR removed carefully and in a controlled operation every single large glass panel working around and above this very vibrant and busy atrium/thoroughfare.
Glazing Refurbishment Limited achieves Gold membership with ConstructionlineGlazing Refurbishment Limited is proud to announce that we have achieved Gold status/membership with Constructionline.
The GR Emergency Response Team were contacted by one of our long-standing Clients to deal with a high level oversized glass panel breakage.Within just 4 – hours the GR High-Level Glass Response Team were on-site with all the required mechanical access and mobile cordons to deal with the removal and making-safe of the broken high-level dangerous glass panel.