Heathrow AirportGlazing Refurbishment were required to replace 576 identified defective Georgian wired glass panels on various locations to the Northlights above the three aircraft holding Penns.
GR were asked to design and install a new glass balustrading solution for this Midlands based School.The brief/scope of the scheme was to either alter the existing balustrade height which was a standard 1100mm high.
Operation - Oversized Glass Unit Installation – LondonOne of the World’s leading Financial & Banking Groups contracted Glazing Refurbishment to undertake a very difficult oversized high-level glazing removal/replacement operation at their prestigious HQ Building located in the heart of London.
GR were tasked to remove and refurbish this extensive high level internal glass feature wall.GR removed carefully and in a controlled operation every single large glass panel working around and above this very vibrant and busy atrium/thoroughfare.
The GR Emergency Response Team were contacted by one of our long-standing Clients to deal with a high level oversized glass panel breakage.Within just 4 – hours the GR High-Level Glass Response Team were on-site with all the required mechanical access and mobile cordons to deal with the removal and making-safe of the broken high-level dangerous glass panel.
Performing a difficult high-level glazing removal for a leading UK utility supplier.One of the country’s leading Utility Suppliers and an award-winning Facilities Management Company contracted Glazing Refurbishment to undertake a very difficult high-level glazing removal/replacement operation at their prestigious HQ Building located in the heart of the West Midlands.