Removal and replacement of multiple defective high level glass panels.

Client
Eurostar
Sector
Retail
Access Method
Mechanical Access Platforms
Partners
Eurostar Procurement
Location
Ashford
Project Duration
5 Days

The GR Southern Project Team – hard at work undertaking emergency out of hours repairs to an existing structural glazed façade, point fixed system for Eurostar in Ashford. The project involved the removal and replacement of multiple defective high level glass panels.

Project Challenges

Working on an existing structural point fixed glass façade.

No items found.

The GR Solution

Deployment of one of the GR Mechanical Access Teams working in close support were the GR Road/Pavement Closure Division.

GR specialise in repairing and replacing structural glazed systems at height utilising a combination of both rope/abseil and mechanical access solutions

For all your structural glazing requirements, please contact the GR Projects Team on: 020 7183 6551.

Need the help of an experienced team on a project similar to this?

Get in Touch

Our Services

Take a look at our full list of services, or learn how we’ve delivered industry leading solutions through our in-depth case studies.

Book a Site Survey

Book an inspection from the UK’s leading Glazing Refurbishment Company.